We've finished somewhere around 420 jobs. These four are the ones we'd send a new client to look at first. The rest are at the bottom of the page in a table you can scan.

Excavator dumping fill at the Mill Creek pad
Featured
2025
Mill Creek · Phase 03 · Structural fill
Case Study

Mill Creek
commercial pad.

The biggest balanced cut we've done. 14 acres, 62k cubic yards moved without importing fill — which the geotech wasn't sure was possible when they handed us the soils report.

  • i.Survey & 3D takeoff2 wks
  • ii.Mass cut & balance5 wks
  • iii.Underground & storm3 wks
  • iv.Finish grade & handoff1 wk
14 acSite area
62k cyMoved
11 wksSchedule
95%Proctor
Full case study (PDF)
Westview Civic Center · Ferndale Jun '24 → Apr '25

Civic plaza & utilities

Selective demo of the prior community center, 1,800 LF of utility installation through an active downtown block. We hit unmapped fiber on day 12 and ran four weeks over. The client was understanding; we ate the bore costs.

Scope18,000 CY · 1,800 LF utility
Outcome4 weeks over · within budget
Excavators on a Tremor jobsite
Highway 9 fiber corridor Mar '24 → Jun '24

3.2 mi of fiber, two municipalities

Directional bore plus open-cut, with DOT traffic control. Boring through glacial till slowed us down; we trenched what we could and bored only where we had to.

Scope16,900 LF · 12 ft typical
Notes2 days lost to weather
Tremor crew on a graded subdivision pad
Northgate residential · Phase II 2022 – 2024

112-lot subdivision

Mass grading, storm and sanitary mains, building pads. Phased across three seasons. We worked the wet winters slower than we wanted, but the foundation crews never had to wait on us.

Scope112 lots · 140k CY
Span2 years, in phases

The rest, briefly.

Selected jobs from the archive. Values are rounded contract amounts, not what we kept.

Year
Project
Scope
Location
Value
2024
Ridgeline Estates
Hillside cut, retaining wall prep
Snohomish
$1.4M
2023
Bayview Distribution Center
Site prep, 7k LF storm
Mt. Vernon
$3.1M
2023
Pioneer Elementary addition
Demo, foundation excavation
Sedro-Woolley
$640k
2022
Sandstone Quarry East
Detention basin retrofit
Acme
$280k
2022
Hatchery access road
Logging road rehab, 2.4 mi
Marblemount
$510k
2021
Cedar Grove Memorial
Cemetery expansion, finish grade
Lynden
$320k
2021
Birch Bay sewer extension
3,400 LF gravity main
Birch Bay
$890k
2020
Trinity Church site prep
Clearing, pad, septic excavation
Lynden
$210k
2020
Whitcomb Industrial Park
40-acre mass grading
Burlington
$2.6M
2019
Lakewood waterline replacement
1.1 mi DI water main
Bellingham
$760k