Tremor

Excavation

Est. 2008 · Licensed & Bonded
Scroll to expand
↓ scroll
Since 2008

Built solid.

Seventeen years of self-performed earthwork — from raw acreage to building-ready pads, on our schedule, on the day we promised.

17 years · 420+ projects · 100% self-performed
17
Years operating
420+
Projects delivered
98%
On-time completion
24/7
Emergency response
Site preparation Mass grading Demolition Underground utilities Land clearing Storm & drainage Foundations Site preparation Mass grading Demolition Underground utilities Land clearing Storm & drainage Foundations

What we move,
shape, and clear.

A complete earthwork capability — from raw acreage to finish grade, residential lots to commercial pads.

Excavator at the Mill Creek pad pouring fill
Featured project
2025
Mill Creek · Phase 03 · Structural fill
Case Study

Mill Creek
commercial pad.

A 14-acre site cut and balanced to plan for a regional distribution center — underground retention, 3,200 LF of storm, and structural import compacted to 95% Proctor. Delivered three days ahead of schedule.

  • i.Survey & 3D takeoff2 weeks
  • ii.Mass cut & balance5 weeks
  • iii.Underground & storm3 weeks
  • iv.Finish grade & handoff1 week
14 acSite area
62k cyMoved
11 wksSchedule
95%Proctor
See the project archive
Our approach

Engineering
before earthwork.

Every project starts with the plans, the soil, and the survey — not the iron. Predictable jobs are planned jobs, and that's why we walk every site before we bid one.

i. Walk the site

Survey, soils, conflicts.

Topography, drainage, access, utility locates. Documented before a tracked machine touches dirt.

ii. Model the work

3D cut & fill.

Takeoffs from civil drawings drive the schedule, balance the dirt, and minimize haul.

iii. Execute

GPS machine control.

Dozers and excavators running the engineer's surface model — grade hit the first pass, not the third.

iv. Hand it over

As-built, clean site.

Final walk, as-built deliverables, signed compaction reports. Ready for the next trade.

Built solid · Finished clean

Move earth.

Have a site that needs it? Send us the plans, or just an address — you'll have a proposal in a week.

Tremor Excavation · Lic. #84-219